SP Global

Architects: CBRE

Main contractor: The Interiors Group

The Client

SP Global focus on powering the markets of the future. Throughout history, the world’s leading organizations have relied on them for the essential intelligence they need to make confident decisions about the road ahead.

The Project

SP Global

Location: Dublin

Architects: CBRE

Contractor: The Interiors Group

Highlights Of The Project

Walls to Workstations supplied and installed 48lm of Optima’s Revolution 54 Shoreditch double-glazed partitions for SP Global offices in Dublin. The installation consisted of two 12.8mm acoustic laminate layers and 12nr double-glazed Optima Edge symmetry doors.

More details about this project: 

  • The glazing was installed into 25mm aluminium trackwork.
  • The vertical joints are 4mm clear system dry joints.
  • RAL colour is 9005.

Key Suppliers:

  • Partition framework and door frames: Optima Partitions, UK 
  • Glass: Tipperary Glass, Ireland 
  • Ironmongery: Proline Hardware, Ireland

The results obtained

Schedule a consultation with our specialists

We’re ready to talk with you about your next project. Get in touch with us and learn first-hand about our top-class services and solutions.

Do you have a general enquiry?

We’re ready to talk with you about your next project. Get in touch with us and learn first-hand about our top-class services and solutions.

This field is hidden when viewing the form
This field is for validation purposes and should be left unchanged.

Walls 2 Workstations collects and processes your personal data exclusively in relation to your enquiry. By submitting this form, you agree that Walls 2 Workstations may contact you to process your request. Further detailed information can be found in our Privacy Policy. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Scroll to Top